Project 02 · Urban planning · DM-2026-027

Analyze a minor variance.

A side setback to regularize, a site sketch and five proposed conditions.

Fictional municipality of Val-Boréal · Documents dated October 21, 2026 · No actual client project.

Open the analysis · PDF, 8 pages (French)
1.20 mexisting garage setback
2.00 mrequired setback in the scenario
0.80 mrequested variance
Summary preview of fictional file DM-2026-027 (French)

What the case shows

  • Present the application and schematic site sketch.
  • Review criteria, available documents and outstanding checks.
  • Compare planning advisory committee options and propose five conditions for review.
  • Prepare draft recommendations, resolutions and public notices.

Summary preview of the supplied document. Select the image to open the full analysis.

Reviews still required
The planning advisory committee and council must assess whether the variance is minor. Mapping, fire protection and validity of proposed conditions require verification. No actual authorization is granted.

The scenario explained

418 Chemin du Lac-Vert: a detached garage’s side setback in fictional Val-Boréal.

Fictional file DM-2026-027 overview
Fictional case elementValue or stepStatus
Detached garage7.30 m × 9.10 mLocated 1.20 m from the side lot line
Setback in the fictional bylaw2.00 m0.80 m difference, or 40%
Claimed correction costCA$38,000Amount stated in the scenario
Planning advisory committee reviewOctober 28, 2026Proposed date
Public noticeNo later than November 29, 2026Deadline presented in the file, to be verified
Council meetingDecember 14, 2026Proposed date

The PDF explores granting the variance with five conditions. This option is submitted to the planning advisory committee; assessment and decisions belong to the competent authorities, including council. Bylaws 400 and 405 and the lot are fictional.

Available files

8-page PDF: application, sketch, analysis grid, options, five proposed conditions, procedure and draft instruments. This planning case is supplied as a PDF; no separate Excel tool is offered.

Facts and data belong to a fictional scenario. Calculations follow from them; interpretations, compliance and proposed decisions require authorized review. External records mentioned in analyses are not supplied as separate source documents. Real-world use requires current-source verification and authorized review.

Open the analysis · PDF, 8 pages (French)

Adapt this work to your project

The agreement defines usable documents, expected analyses and your team’s reviews.

Discuss my projectView urban planning applications